3 EAST ASH ST.
P.O. BOX 884
LOMBARD, IL 60148
This series of photos show 2 WC trains meeting at Centerville siding. Train 50 arrives first and takes the siding. Soon, train 219 with a CSX SD40-2 as the second unit passes on the main. We see coming and going views from the overpass that spans the passing siding. The Freds on the rear ends of the trains flash away and the trains are both quickly up to track speed. Centerville is located midway along the upper deck of the layout. It will be a town of moderate size and industry, and will feature a small yard to support the local and interchange traffic.